Main bathroom hasn't been touched since the house was built in 1998
Bought this St. Albert house knowing the bathroom needed work but kept pushing it back. Grout is cracking, the vanity is falling apart, and the exhaust fan sounds like a helicopter. Finally getting serious about a full remodel and trying to figure out realistic costs and timelines before calling anyone out. Anyone done a full bathroom gut in St. Albert recently and can share what the process actually looked like?
9 Views



Same boat in St. Albert. We ignored our ensuite for years—grout crumbling, fan screaming like a drone. Finally ripped it all out last spring. What surprised me most was timeline: demo was 2–3 days, but plumbing + tile delays stretched it to about 3–4 weeks total. Costs weren’t small either, but predictable once layout stayed the same. A buddy went through it too and said budgeting buffer saved him. If you’re planning it, this Bathroom renovation company in St. Albert, AB helped us get a rough scope before calling contractors.